Abebu Dinku Water Bottling and Non-Alcohol Beverage Factory has introduced a new production line. At a ceremony held on Thursday April 12 at Elilly International Hotel the company launched its new production line. Soon they will install a third production line at their factory, increasing their capacity and turning them into one of the biggest bottled water producers. So far the company has installed a bottling machine at the industry located in Tatek, Gefersanono (Burayu), Oromia regional state, 18kms northwest of Addis Ababa, with the capacity of packing 72 thousand bottles of water per hour. During his opening speech Abebe Dinku, General Manager and owner of the factory, said “To do that we have installed our own plastics factory, and a state of the art lab equipped with latest Italian technology,” Abebe said.